EC&M MAGAZINE PDF

OSHA list of top 10 most cited safety violations for Need expert advice on the National Electrical Code? Try EC&M’s CodeWatch. Electrical Construction Maintenance Contact Us Page.

Author: Neshakar Togami
Country: Guinea-Bissau
Language: English (Spanish)
Genre: History
Published (Last): 13 December 2008
Pages: 422
PDF File Size: 12.38 Mb
ePub File Size: 18.42 Mb
ISBN: 930-4-95297-603-5
Downloads: 46676
Price: Free* [*Free Regsitration Required]
Uploader: Zulumi

Download Registration Thanks for registering. For one thing, service conductors for one structure cannot pass through the interior of another structure [ A service drop or lateral can supply only one set of service-entrance conductors, with three exceptions For more information about TIC, please visit www. If your web browser’s integrated pop-up blocker is enabled, it may prevent the some features on this site from functioning normally. This separation maintains the integrity of your fault protection.

The rules for underground service lateral conductors The routing requirements of service conductors differ from those of other conductors. Remember that service conductors originate at the utility service point and terminate on the line side of the service disconnecting means service equipment. Size protection devices no smaller than percent of the continuous load.

What’s new on EC&M Magazine

Raceways for overhead service drops Locate your service-drop magqzine so they are not readily accessible. If we mixed service conductors with other conductors in the same raceway, a fault that occurred between the service and feeder conductors could bypass the overcurrent protection for the feeder conductors. Please login with your email address. Route the phase conductors through separately bushed holes in the weatherhead, and install a drip loop below the service head or below the termination of the service-entrance cable sheath.

To identify a service conductor, step back and see if you are dealing with a service or a load side distribution point. Routing The routing requirements of service conductors differ from those of other conductors. Click here to accept cookies. Attach overhead service-drop conductors to a point not less than 10 ft above the finished grade. Locate the service head above the point of maagzine or within 2ft of the point of attachment if this isn’t practical.

  ENORMOUS RADIO JOHN CHEEVER PDF

Select a category, choose a Product Family, then select from the list magwzine available documents. Entries submitted were evaluated carefully by a panel of judges comprised of experts in electrical engineering, contracting, plant facilities, and maintenance industries. Unfortunately, this is often a “missing step” in the design process. With the capability to test products together as a system before sending out into the field, TIC ensures the highest level of quality, performance, and reliability.

Service equipment does not include the metering equipment [ Fc&m Raceways for magazinne service drops To properly apply the installation requirements for service conductors and equipment, you must first define where your service entrance starts and ends.

Subscription:Landing Page

These include meters and tap conductors for certain purposes. Name Email Phone Question.

Service conductors include service-entrance conductors for overhead service drop and underground service lateral. Ungrounded service-drop conductors cannot be smaller than 8 AWG copper or 6 AWG aluminum except in limited-load installations.

The service disconnect must be capable of disconnecting all service-entrance conductors from the served premises wiring. You do not have to provide service conductors with short-circuit or ground-fault protection, but you ,agazine provide overload protection via the feeder protection device. Graphics not included in the Newsletter. How can you correctly and efficiently follow service installation requirements?

A pushbutton that activates the electromagnetic coil of a shunt-trip circuit breaker is insufficient see This rule does not prohibit the mixing amgazine service, feeder, and branch-circuit conductors in the same service equipment enclosure. Arrange the service drops and service-entrance conductors to prevent water from entering the service equipment-install the point of attachment below the weatherhead, per But, feeder conductors covered by Articles and ev&m on the load side of service equipment.

  AUDIOSTRIDER 990 MANUAL PDF

Service Entrance Definitions Service point. And you apply different rules, depending on whether a service conductor is inside or outside a structure.

Each ungrounded service conductor requires overload protection at the point where the service conductors terminate see The AS3 is ideal for Industry 4. You cannot magazin equipment to the supply side of the service disconnect enclosure, except for the seven categories identified in The rating of the protection device must not exceed the ampacity of the conductors see But if you start at that point and then magzzine Article methodically, you will efficiently meet the requirements for a safe service installation.

Do you have a question?

State of the Industry with EC&M Magazine (Part 1)

You cannot use trees as supports If you encounter ec&k problems or have any questions please contact TIC-Webmaster toshiba. You cannot connect emergency standby power ahead of service equipment Figure The AS3 can be supplied with additional options to expand control, allow greater flexibility, and provide better protection for applications.

It’s often a good approach to start a service installation by deciding which conductors belong in the service. Service Equipment Protection You do not have to provide service conductors with short-circuit or ground-fault mwgazine, but you must provide overload protection via the feeder protection device. Multi-protocol communications channels empower businesses to learn and adjust from data available through connected manufacturing.

Author: admin